Anne Ottenbrite Pool

The Town recognized a number of programming and building maintenance deficiencies with the Anne Ottenbrite Pool. The Canada Infrastructure Funding presented the Town with an opportunity to complete these much needed improvements.

BBA confirmed requirements and preparing addition renovation design and planning for barrier free accessibility change rooms and pool. The pool and deck area were designed with reinforced concrete. During construction, BBA provided detailed shoring designs of the existing structure, reviewed structure connections and load transfer to the existing structure, and reviewed demolition of the existing framing.